Industry News

Industry News

Gush drenchs tower

2026.01.13

Table of Contents

    Gush drenchs tower.jpg

    Gush drenchs towerThe technology is advanced, move reliable, economy is applicable, safe environmental protection is low, cover an area of an area small, waste gas of mist of the acid after purifying under discharge a standard, Maintenance is convenient, service life is long,

    One, gush drenchs the tower introduces:

    The working principle of off-gas treatment equipment is the pollutant in gas depart comes out, translate into is harmless material, purify aeriform purpose in order to achieve.

    It belongs to differential to contact refluent type, the filling inside tower body is the main component part that gas fluid two-phase contacts. Tower put oneself in another’s position is external after gas enters tower system, gas enters filling tower, have on filling layer come from the gush at coping to drench liquid and the gush in front drench liquid, form a lilquid film on filling, when gas sheds classics filling space, be contacted with filling lilquid film and undertake or counteract reaction, filling layer can offer enough big auditive surface to accumulate, to gas flow is not sent again had caused great resistance, via absorb or counteracting the aeriform classics demist after implement after collecting, via giving tower of blast tuyere eduction outside.

    2, gush drenchs tower technological process sketch map:

    Gush drenchs tower.jpg of technological process sketch map

    3, gush drenchs the application of the tower:

    Chemical industry, light industrial, printing and dyeing, medicine, steely, machinery, electron, appearance, eletroplate the tail gas such as the organic waste gas that in waiting for industrial department to produce a course, discharges, vitriolic, nitric acid, hydrochloric acid, hydrofluoric acid and sulfur oxide (SOx) , azotic oxide (NOx) , use purifying device of industrial waste gas, the effect of attainable satisfaction.

    4, gush drenchs the advantage of the tower:

    1. Waste gas purifies a tower suitable scope is wide

    2. Waste gas purifies efficiency tall

    3. Resistance of off-gas treatment tower is low

    4. Equipment installation is agile, convenient

    5, Gush drenchs towerStructure

    Use layer of sparge tower filling to serve as those who enrage fluid two-phase to contact component to send simple equipment. Setting of filling gripper shoe is in filling tower is bottom, filling is arranged with pile means go up in gripper shoe. Filling pressure board installation is in filling upper part, in order to prevent up air current is blown. Sparge tower from cat head ejective liquid, distributing through the liquid implement arrive at filling, be down flow along filling surface. After gas distributings from tower bottom, the space that the liquid passes filling layer is successive and refluent. In filling surface, gas fluid two-phase tightens intimate contact, undertake passing pledging. When laminar flow of liquid edge filling is moved, can have mural face flow sometimes. Effect of mural face flow brings about gas fluid two-phase to distributing mediumly in filling layer inhomogenous, bring about pass qualitative efficiency to drop. Accordingly, sparge tower medium filling layer is divided into two parts, intermediate setting has repartition unit, spray again after repartition on bottom filling.

    6, Gush drenchs towerApplicable note

    1. Circular discharge adjusts: Drench by gush pump of tower water supply decides, when a boiler moves but open, when stage or 3 two pump run winter at the same time, should all open, the discharge of slop pump should adjust according to allowing circular discharge. Make it equal.

    2. Sparge tower casts medical canister cast increase an amount: When moving boiler, 2 bags are joined in winter alkaline with 5 bags of lime, be like 2, 3, can increase dosage according to relevant measure.

    C. Spray tower sedimentation basin should clear regularly, weekly, the summer one, winter every 3 days.

    When eduction of grey water segregator, every time when shift gears is discharged, part of one’s job does not open drain valve, until have till clear water is discharged.

    3. Above rotates the component often should be checked, oiling, remove trouble in time, in order to assure the purify result of sulfur of gush tower hare.

    4. When fluctuation stair, want to notice safety, want to have ego safeguard and mutual and safe consciousness.

    5. After coming off work clear in time wholesome establishment, make people OK walk on building site.

    Limited company of equipment of environmental protection of Zhejiang grand rich is scientific research of a market, design, production, safeguard and sell the equipment of environmental protection of omnibus new and high technology at an organic whole to produce manufacturer, major carries on off-gas treatment, dust processing, the design construction solution of the engineering professional work such as spray paint room, major produces off-gas treatment equipment, remove dust equipment, the product such as spray paint room, above is small make up everybody to introduce gush of series of equipment of our company off-gas treatment to drench tower, more product detail andGush drenchs tower price welcomes an incoming telegram to seek advice.