Off-gas treatment equipment installs 5 big notes!

2026.01.13

Table of Contents

    2021, the censorial strength of exhaust emission is very strict, the market that purchases off-gas treatment equipment gets angry more hot. The off-gas treatment equipment that environmental protection of Zhejiang grand rich produces and establishment of relevant form a complete set had undertaken before leave factory strict quality is checked, eligible and rear can deliver goods. Because this client receives the to assembling figuration part after equipment not to need to disassemble and recombine, but need checks core equipment and fittings according to detailed list all ready. Environmental protection of Zhejiang grand rich reminds everybody, when equipment is installed, should notice the following 5 phase.

    Off-gas treatment equipment



    The installation of off-gas treatment equipment 5 big notes:

    One, installation plans stage

    Equipment of check the amount, examination, so that install working procedure,go on wheels. When the process that carry or opens box is medium, if discover the damage of lacquer, antirust layer, should undertake be repairinged necessarily. When installation, in equipment the surface cannot have the operation such as electric welding, gas cutting, in order to make sure internal composition is not destroyed.

    2, try out plans stage

    After the project such as installation, tubing, appearance is all and finishing, want to undertake workbench cleans the job in time.

    3, move debug level

    After preparative phases ends, have off-gas treatment facility switch on the mobile phone test.


    Off-gas treatment equipment

    4, daily moving phase

    The phase that runs normally was entered after preparation, test, operation personnel should examine equipment site regularly everyday, the result according to the facts the record comes down, give summary together with moving record, as the data of regular maintenance.

    5, phase of later period care and maintenance

    After investment of off-gas treatment equipment moves one year, want to undertake periodic care and maintenance, this is to assure the 2nd year one year in safety of the old haunt that do not have a thing moves. Jockey to decrease time, examination staff and overhaul worker fall in permissive circumstance, undertake at the same time with other component as far as possible. Have like discovery when the examination unusual, must handle in time, give solve.