Operating rules of safety of lacquering of gush of room of the lacquer that bake

2026.01.13

Table of Contents

      1, the work place that spray paint of house of the lacquer that bake works is prevented deposit explode combustibly, easily article, work place prevents room of the smoking, lacquer that bake be necessary between spray paint appliance of stock fire control. Hold the position that should know equipment of bring back to life and use a method.

    2, the sanitation that should hold to work environment and ventilated. Dip lacquer, spray paint measures bigger successional line, be necessary to install convulsions cover and equipment of the processing that abandon lacquer. Be necessary when the operation Dai Fang poisonous guaze mask or ventilated mask.

    3, in paint work place 10 meters of less than, forbid to undertake the bright anger such as electric welding, incision works.


    Operating rules of safety of lacquering of gush of room of the lacquer that bake

    4, workpiece of spray paint of house of the lacquer that bake should be put smooth and rear can undertake operating. The ladder that uses when exercise, room of the lacquer that bake is due defend slippery method, must not apply otherwise.

    5, all round electrified equipment and distribution box a meter of less than, prohibit spray paint operation. Operation has in equipment test-drive address, want removed and sure interval. Prevent lacquer or spray paint are brushed on the equipment of exercise. When equipment carries on-line product or the workpiece spray paint that hang catenary to go up, answer to undertake inside spray booth. When the operation, be necessary to wear good guaze mask or mask.

    6, allocate when containing the painting with plumbic pink or solvent rising larger chroma, should wear respirator. Prevent wash his hands with benzine and banana oil.

    7, when processing spray gun jams, after free of dawn of the needle that use steel, should right 45 ° horn tries gush, must not be opposite to room of the person, lacquer that bake oneself, avoid high-pressured gas blowout to give a person.

    8, ready-mixed paint, be bored with child, the chemical burden such as agent of nitro- lacquer, ethylene and benzine tinderbox are tasted, part of one’s job is lain between deposit, sealed save.

    9, the frame of workpiece is put to answer between spray paint of house of the lacquer that bake every quarter clears away incomplete lacquer, when the article such as lacquer of gauze of processing useless oil, useless kerosene, benzine, terebinthine, saltpetre, should inform the member that guard a part to reach this workshop safety, and the personnel that Lin clique has experience undertakes handling.

    10, exercise site is cleaned before coming off work, put good thing, cotton waste gauze should be put appoint place.

    11, of equipment of room of the lacquer that bake involve engine order: Close report to heat first the canal heats hold accuse, after waiting for circular fan delay time to work 25 minutes, the hand moves a closed loop fan, close wind act machine, close total power supply.

    12, inside the place of besmear outfit work of room of the lacquer that bake, prevent belt catch fire source, stop bright fire work. Prevent use any dynamoelectric things, prevent in deposit all round drying oven explode combustibly, easily article. When repairing an operation to bright fire works, be necessary to handle partial approve of via company safety, safe principle reads applying get angry to just can work.

    13, if encounter electric equipment to have unusual appearance, do not get proceed operation, answer to clean defect in time. Allow when to be divided before overhaul or doing clean work, be necessary to intercept power source, be in hold accuse the suspension on box ” prevent electrify ” etc prevent caution card, send person specially assigned for a task to undertake supervisory (be necessary) of 2 people above, the ability after waiting for the overhaul and cleanness to end but debus prevents caution card, evacuation superintendent. When the overhaul discharges fan, be necessary to wait for electric machinery to stop completely after turning, talent is entered repair inside casing.

    14, waste residue of pool of spray room accumulation needs time keeping to clear away, after before cleaning, be necessary to obtain company leader or safe processing part to read, and be necessary to treat a share in safety attendant supervise below, fang Kejin enters the operation inside accumulation pool. Work number is not gotten little at 3 people, power source of water pump electric machinery should close when exercise, press in the mouth that enter a pool put protect column temporarily, pensile prevent caution card. Enter staff of the work inside the pool to be worn please prevent slippery shoe, avoid to slip compose is endangered into person. The illume inside the pool chooses safe voltage floodlight please (voltage of limited space illume should is less than be equal to 36 bend over, inside wet container, narrow container exercise should is less than be equal to) of 12 bend over. Clear away the waste residue that go out to must not be thrown in disorder at will, should meet collect is placed special call in inside iron canister, hand in call in by the special environmental protection that has aptitude arrangement processing.