      Daily protection maintains

    1. Everyday the metope inside clean room, glass and platform base, prevent dust and market of lacquer dust pile.

    2. Weekly cleanness lies between dirt net into wind. When like the atmospheric pressure inside the room without reason increases, be necessary to replace a wind to lie between dirt net.

    3. Water of every months of clean platform dish, clean burn implement the derv that go up filters equipment.

    4. Every quarter should examine the transmission leather belt that enters wind and platoon wind electromotor lax.

    5. Ying Qingjie of every half an year is whole spray paint room and platform net, examine circular air door, examine burn implement smoke evacuation passageway, the deposit inside clean gasoline tank.

    6. Answer every year converter of clean and whole heat energy, include burn room and smoke evacuation passageway.

    7. Primary derv filter works 100 hours to need to tear open next cleanness commonly, 200 hours replace his 2 times mesh applies filter core; 200 hours to tear open its next cleanness commonly.

    8. Atomizer maintains, apply 300 hours or so, if discover blaze is very small and fumy, tear open its next cleanness please can. Do not want below regular state often unpick and wash.

    Air filters the system is replaced

    1. Filter into gas cotton and bottom cotton apply the left and right sides or 100 hours of 30-35 commonly the car is examined, undertake aspiration is cleared away or replace.

    2. Top cotton applies the left and right sides or 400 hours of 100-150 commonly the car is examined, undertake aspiration is cleared away or replace. When if discover the smoother when spray paint is not discharged,going out, coping filters cotton replaces demand.

    3. General and successional spray paint controls activated carbon 100 hours or 70-80 of big spray paint the car undertakes replacing.

    4. The trash containing lacquer after replacing and useless lacquer broken bits deposit the risk trash that appoints in the factory to deposit a dot, hand in consistently by the factory deal with by the company that has processing aptitude.

    Each system technical ability asks

    Send, the system that discharge wind sends, clear away when crust of the electric machinery that discharge wind and wind Xie Yingshou, must not paint, bilge piles up. All approach that the paint in air channel adopts should time keeping is cleared away.

    Heat the connection of district of the oil path of systematic fuel heating installation, gas should link firm, firm, must not have appearance of leakage, ooze. Heat exchanger ought not to have divulge, solder, perforative, be out of shape. Heat exchanger appearance should adhere to without paint.

    All cable such as circuitry of lighting system electromotor, illume should not have ageing phenomenon.

    Safety defends room of requirement spray paint is due operation of *** sex security and the literal mark that maintain, be in marked azimuth equipment.

    Repair

    Repair personnel to be necessary to adopt a practice, and have corresponding talent. It is to spray paint the room undertakes suppose bigger repair, demand manufacturer professional undertakes. Do not get do sth without authorization to tear open, repair or change his costume or dress spray paint room.

    Use at repairing replaced crucial point component, should agree with the requirement of relative standard, buy in former mill as far as possible.

    Personnel talent

    One, room of spray paint of ""> of spray paint room operates personnel, should adopt appropriate practice and have:

    1, the talent; that according to spray paint room operating rules undertakes operating

    2, roast during requirement operation personnel must not leave hillock;

    3, the risk element that holds work place and work station existence, guard against method and disturbance lash-up method.

    2, personnel of security of spray paint room, should adopt appropriate practice and have:

    1, principle of room of understanding spray paint, construction and; of relevant common sense

    2, the requirement safety that presses manufactory of spray paint room and the talent that repair.

    3, spray paint room treats staff, should adopt appropriate practice and have:

    1, hold relevant safety to produce; of new common sense, new mastery of a skill or technique

    2, those who hold spray paint house apply state;

    3, the relevant data that saves a manufactory to supply and the account that be checked every time and repair.

    Account

    1, day-to-day operation account: Of spray paint room, close machine time; to operate state of exercise of room of personnel, spray paint to wait.

    2, daily protection account: Protection maintains time, project, personnel, state of exercise of spray paint room.

    3, defect account: Defect time, phenomenon, frequency.

    4, repair account: Time, repair personnel, defect to reflect, repair content, component to replace reach defect to clean state and conclusion to wait.